BCL Engineering Ltd - PROVIDING MUNICIPAL ENGINEERING SERVICES FOR OVER 40 YEARS
  • BCL
  • services
    • Water Supply & Treatment
    • Wastewater Treatment
    • Land Development
    • Transportation and Roads
    • Solid Waste
    • Buildings & Municipal Services
    • Surveys
    • Electrical Engineering
    • Storm Water & Drainage
  • Projects
  • Careers
  • Contact

Fox Lake Lagoon

FoX LaKE LaGooN UPGRaDE 

Picture

Little Red River Cree Nation (alberta) 
Project Value: $19,125,000
​Date Completed: 2019

PRoJECT BaCKGRoUND

Picture
Located adjacent to the Peace River, Fox Lake’s existing lagoon lacked sufficient capacity and inspections noted integrity of the existing berms was compromised. As a result of the existing lagoon condition, untreated wastewater was being directly released into the surrounding environment. BCL was retained by the Little Red River Cree Nation and the community of Fox Lake to complete design of a new lagoon and related sewer infrastructure to meet the long term needs of the community.
Preliminary field investigation included extensive topographic surveying and geotechnical site excavations to confirm site selection and soil conditions for lagoon expansion. BCL completed the design and provided construction services for a new six cell HDPE lined lagoon and incorporated modifications to the existing storage cell to serve as an ex-filtration cell for gradual release of treated effluent. The project also included a new sewage force main as well as a new pumping station complete with an upstream sewage grinder and back-up power generator to ensure continued sewage handling capabilities in power failure situations. ​
Picture
Picture

PRoJECT HIGHLIGHTS

  • Six HDPE lined cells
  • 350,000 m3 of earthwork
  • 230,000 m2 of HDPE liner.
  • 2,100 lin.m, force main
  • Wet well sewage pumping - station, complete with sewage grinder, 35 hp 38.9 L/s sewage pumps, and 100 kw backup power generator.​
Picture

Services Provided

  • Preliminary Design
  • Detailed Design
  • Tendering
  • Resident Engineering - Contract Admin
  • Commissioning - Post-completion ​​

PROVIDING MUNICIPAL ENGINEERING SERVICES FOR OVER 40 YEARS

Picture
Phone: 306.477.2822
​Email: [email protected]
200 - 302 Wellman Lane
Saskatoon, SK
S7T 0J1
  • BCL
  • services
    • Water Supply & Treatment
    • Wastewater Treatment
    • Land Development
    • Transportation and Roads
    • Solid Waste
    • Buildings & Municipal Services
    • Surveys
    • Electrical Engineering
    • Storm Water & Drainage
  • Projects
  • Careers
  • Contact