Alexis Nakota Sioux Nation had an existing treatment process that was unable to produce water capable of meeting Canadian Drinking Water Quality Guidelines. BCL was retained to complete the planning, design and construction engineering of a new water system for the community. After completion of a feasibility study, the most advantageous option involved connecting to the treated water supply main from the West Inter Lake District (WILD SUPPLY), which was delivered to the Nation’s boundary.
PRoJECT HIGHLIGHTS
|
Services Provided
|